Commissioning Instructions For The Chp Module - Viessmann Vitobloc 200 EM-50/81 Operating Instructions Manual

Block-type thermal power plant module for natural gas operation
Table of Contents

Advertisement

Commissioning
3.3

Commissioning instructions for the CHP module

WARNING
The information about the relevant work
during the commissioning is merely
meant to be a memory aid especially for
the authorized specialists who have
been trained by the CHP module manu-
facturer for the commissioning of the
CHP module.
jobs during the commissioning
1.
Check that the module has been filled with a wa-
ter/anti-freeze mixture and engine lubrication oil
according to the regulations for the operating
resources.
2.
Check that the transport locking device has been
removed.
3.
Check the connecting systems pursuant to com-
missioning protocol.
4.
Check the connection of the power cables.
5.
Check the connection of the measuring-circuit
voltage.
6.
Check the connection of the system-tie circuit
breaker.
7.
Check the connection for selecting the floating
value or the fixed value.
8.
Check the connection for the external emergency
stop.
9.
Check the connection for faults caused by knock-
ing.
28
documentation, measuring points or set values
- assembly and commissioning instructions, chapter 5
"Operating supplies"
- enter the product designation of the engine lubrication oil
and anti-freeze agent used into the commissioning proto-
col
- assembly instructions chapter 3.5
"Removal of the transport locking device"
- cooling water system
- heating system
- gas system
- exhaust gas system
- ventilation system
- lubrication oil system
- cabling
- record the results in the commissioning protocol
- switching diagram, sheet 1
- module control panel: X1/L1.L2.L3 (1Q1) as well as N
and PE or PE-N bridge (Cu rail).
- switching diagram, sheet 1
- module control panel:
in the case of parallel operations only: bridge from -
X1/4.5.6 to -X1/7.8.9.
- switching diagram, sheet 13
- module control panel:
the messages and "ON-OFF" commands for the system-
tie circuit breaker and for selecting the power stand-by (if
necessary) must be activated; if there is no system-tie
circuit breaker, only the message "System-tie circuit
breaker ON" must be bridged to terminal -X1/12.13; eve-
rything else remains unconnected
- switching diagram, sheet 19
- module control panel:
depending on the operating mode, the commands and
the signal for selecting the floating or the fixed value must
be activated
- switching diagram, sheet 13
- module control panel:
external emergency stop to -X1/10.11, if not existing
bridge to -X1/10.11.
- switching diagram, sheet 18
- module control panel:
fault caused by knocking to -X1/20.21, if not existing
bridge to -X1/20.21.
Operating instructions for the natural gas-fuelled CHP module VITOBLOC 200
INSTRUCTION
The following documents are required in
addition to these operating instructions:
– a separate protocol about the com-
missioning
– switching and assembly diagrams
according to the purchase order