Installing The Power Supplies In The Cisco Sce8000 Gbe Chassis - Cisco SCE8000 GBE Installation And Configuration Manual

Hide thumbs Also See for SCE8000 GBE:
Table of Contents

Advertisement

Chapter 4
Installing the Cisco SCE8000 GBE Chassis
Figure 4-16
FA N ST
SC E8 00
Step 5
Place the grounding wire lug against the grounding pad, making sure there is solid metal-to-metal
contact.
Step 6
Secure the grounding lug to the chassis with two M4 screws. Ensure that the grounding lug will not
interfere with other hardware or rack equipment.
Step 7
Prepare the other end of the grounding wire, and connect it to an appropriate grounding point in your
site to ensure adequate earth ground for the Cisco SCE8000 GBE chassis.

Installing the Power Supplies in the Cisco SCE8000 GBE Chassis

The SCE8000 GBE chassis is shipped with the power supplies (AC or DC) already installed. Should it
be necessary to install a power supply module, refer to
page 9-4
OL-19897-02
Installing the System Ground
Grounding
SCE 8000
AT U S
-SC M-E
SC M
1
OPT ICA L
BYP ASS
CON SOL
E
POR T 1
LINK /
STA TUS
10/1 00/
ACT IVE
OP TIC AL
1000
BY PAS S
SC M
2
SCE 8000
-SIP
0
SIP
3
STA TUS
SCE 800 0
SPA
INT ERF ACE
PRO CES
SPA -1X1
SOR
0GE -L-V
2
2
A1
0
B1
C1
4
D1
A2
Rx Tx
0- FA N
B2
C2
A1
D2
2
OP B- SC
B1
E8 K- 2L
C1
-M M
L1
D1
A
C
B
A2
L2
D
Rx Tx
B2
C2
D2
CT RL
OP B- SC
A
C
B
E8 K- 2L
D
-M M
L1
A
C
B
L2
D
CT RL
A
B
C
D
Installing the Power Supplies in the Cisco SCE8000 GBE Chassis
System ground
connector
lug
Wire
SCE 8000
EXTE NDE
D SER VICE
CON TRO
L MOD ULE
LINK /
10/1 00/
ACT IVE
1000
MA STE R
SYS TEM
PO WE R
1
SPA -1X1
0GE -L-V
2
A1
B1
3
C1
D1
A2
Rx Tx
B2
C2
A1
OP B- SC
D2
B1
E8 K- 2L
C1
L1
-M M
D1
A
OP 88K
C
-HD -EX
A2
L2
B
D
T-P NL
Rx Tx
B2
C2
1
CT RL
OP B- SC
D2
A
B
E8 K- 2L
C
D
-M M
L1
A
C
L2
B
D
3
CT RL
A
B
C
D
Removing and Replacing the Power Supply,
Cisco SCE8000 GBE Installation and Configuration Guide
System ground
connector
4-21

Advertisement

Table of Contents
loading

Table of Contents