User Manual (Three-phase, Three-wire)
Tools and Meters
discharge (ESD)
gloves
Torque screwdriver
Phillips screwdriver
(M3/M4/M5/M6/M
8)

3.1.3 Power Cables

The currents listed in the following table are measured at a rated voltage of 380 V.
Table 3-2 Recommended power cable cross-sectional area (50 kVA–300 kVA)
Item
Mains
Mains input current
Issue 05 (2019-12-20)
Cable cutter
Insulated torque
wrench
(M6/M8/M12/M16)
Table 3-1
lists only the common tools for installation and cable connection. For more dedicated tools
required, see the corresponding component manuals. Prepare tools based on site requirements.
The UPS can generate large leakage currents. A circuit breaker that provides leakage
current protection is not recommended.
If multiple UPSs are to be connected in parallel, input and output power cables for each
UPS should have the same length and specifications.
50 kVA
88
Copyright © Huawei Technologies Co., Ltd.
Brush
Heat shrink tubing
100
150
kVA
kVA
176
264
shoes
Flat-head
screwdriver
(2–5 mm)
Insulated adjustable
wrench
200 kVA
250
kVA
352
440
3 Installation
300 kVA
528