Chapter 2 Preparations
Battery bracket made of plastic:
1. Refer to steps 1 to 6 in Chapter 2 (1.3 Overview of Installation and Removal) for preparations.
2. Lift the processor duct and remove it from the server.
3. Connect the FBU control cable (600mm)
to the FBU.
4. Remove the battery bracket from the
duct.
5. Install the FBU and fix the cable at the
holder on the duct in accordance with
the figure on the right.
90
Note
Make sure that catches are surely engaged with the FBU
Express5800/R120e-1E User's Guide