NEC Express5800 Series User Manual page 86

Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

Chapter 2 Preparations
4. Remove the four screws and remove a
cover of a battery bracket.
5. Slide and lift the battery bracket in
accordance with the figure on the right,
and remove the battery bracket from the
duct.
6. Install the FBU and fix the cable at the
holder on the duct in accordance with
the figure on the right.
7. Remove the screw securing the riser card.
Hold the both ends of the riser card and lift it
off.
86
Note
Make sure that catches are surely engaged with the FBU
Note
Be careful not to contact with other parts.
Express5800/R120e-1E User's Guide
1. Installing Internal Optional Devices
Cable
Screws

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exp480aExpress5800/r120e-1e

Table of Contents