UPS5000-E-(360 kVA-480 kVA)
User Manual (40 kVA Power Modules)
Figure 3-5 Removing the packing materials and foam
Step 5 Remove the moisture-proof plastic bags and take out the fittings box.
Step 6 Check whether the UPS is intact.
1.
2.
Step 7 Remove the screws that secure the cabinet and pallet.
Issue 07 (2020-01-10)
Visually inspect the UPS appearance for shipping damage. If it is damaged, notify the
carrier immediately.
Check that the fittings comply with the packing list. If some fittings are missing or do
not comply with the packing list, record the information and contact your local Huawei
office immediately.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
49