Page 35 of 52
The maintenance technician must make sure the power supply is disconnected before
servicing the electrical parts inside the machine bodywork.
6.2.5
Periodicity of maintenance operations
ACTIVITY
FREQUENCY OF MAINTENANCE
At the end of every work cycle
Washing and sanitising
Before every period of inactivity of the machine
Replacement of O-Ring
Annually
gaskets
Draining of water cooling
At the end of every work season
system
At least once a year
Glycol level check
Every time a leak occurs
Replacement of fuses
When required
–
TECHNOGEL SpA
THIS MANUAL IS THE PROPERTY OF
ALL REPRODUCTIONS, EVEN PARTIAL, ARE FORBIDDEN
35