Download Print this page

IKA C 7000 Operating Instructions Manual page 49

Calorimeter system with cooler

Advertisement

 3UHSDUDWLRQ DQG &DUU\LQJ 2XW 0HDVXUHPHQWV
6HLWH 
g
Close the decomposition vessel C 7010 oder C 7012
Place the cover onto the lower section and push down until it presses against the
stop piece in the lower section.
C 7010/ C 7012
Place the union nut onto the lower section and tighten by hand.
The decomposition vessel can now be filled.
h
®
Finally, the decomposition vessel is filled with oxygen at 30 bar using the C 48 IKA
oxygen filling station. Follow the operating instructions for the C 48 oxygen filling
station.
7KH R[\JHQ SUHVVXUH VKRXOG EH  EDU DQG PXVW QRW H[FHHG  EDU 8VH TXDO
LW\  R[\JHQ 
SXUH R[\JHQ 
Following preparation of the decomposition vessel, it will be subjected to either a
calibration or a calorific value determination. The two procedures are very similar, so
that they are described together below. Where there are differences these will be
explained.
When the decomposition vessel has been prepared, a calibration or a calorific value
determination is prepared by carrying out the following steps:
®
IKA
-WERKE C 7000
Ver. 07 09.07
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the C 7000 and is the answer not in the manual?

This manual is also suitable for:

C 7002