Installation Procedure - Proxim Tsunami MP-8100 Series Installation And Management Manual

Hide thumbs Also See for Tsunami MP-8100 Series:
Table of Contents

Advertisement

2.3 Installation Procedure

This section describes the procedures to install and mount the unit and to align the antenna. The installation procedure does
not include information on the mounting and connection of external antennas.
IMPORTANT
This device must be installed by a trained professional, value added reseller, or systems integrator who is
familiar with RF planning issues and the regulatory limits.
CAUTION!
Heed all the WARNINGS. Follow all the instructions. Do not defeat the safety purpose of the grounding.
Only use attachments/accessories specified by the manufacturer.
CAUTION!
There are no user-serviceable parts inside. All services must be performed by qualified personnel.
CAUTION!
For Regulatory Information and latest product updates, including firmware and the MIBs, Proxim
recommends visiting the Proxim Support site at http://support.proxim.com.
WARNING!
When connecting a device to the second Ethernet port (Eth2), Proxim recommends to verify if it is a
802.3af compatible device. If you are planning to use any other device, please insert a power splitter (not
supplied) between the second Ethernet port and the device, otherwise it may damage the device.
NOTE:
• The Advanced Configuration window provides a selectable Frequency Domain field that automatically provides
the allowed channel bandwidth and frequencies for the selected frequency Domain/Country as well as, where
applicable, Dynamic Frequency Selection (DFS) and Transmit Power Control.
• Non-US installers should not add an antenna system until the Frequency Domain is selected, the unit is rebooted,
and the proper power level is configured. The output power level of the final channel selected by DFS scan can be
found in the Event Log.
• Be sure to read the Release Notes file on the product CD as it contains software version and driver information.
• Equipment is to be used with, and powered by, the power injector provided with the product package or by a
power injector that meets the following requirements:
– UL-Listed/ITE (NWGQ)
– Limited Power Source Output per UL/IEC 60950
– CE-marked
– Approved for Power-over-Ethernet
– Rated output, 48 VDC/0.5 A
Tsunami MP-8100 Installation and Management Guide
Installation and Initialization
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents