Recommendations - REMEHA Calenta 25s Installation And Service Manual

High-efficiency wall-hung condensing gas boilers
Table of Contents

Advertisement

4. Installation
40
4.9.2.

Recommendations

WARNING
Only qualified professionnals may carry out electrical
4
connections, always with the power off.
The boiler is entirely pre-wired. Do not modify the
4
connections inside the control panel.
Earth the appliance before making any electrical
4
connections.
Make the electrical connections of the boiler according to:
4 The instructions of the prevailing standards.
4 The instructions on the electrical diagrams provided with the
boiler.
4 The recommendations in the instructions.
CAUTION
Separate the sensor cables from the 230 V cables.
Calenta 25s - 28c - 35s - 40c
040412 - 7600585-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Calenta 40cCalenta 28cCalenta 35s

Table of Contents