Converting The Manual Override - Festo VIFB11-02 Series Manual

Valve terminal/valve sensor terminal with field bus connection
Table of Contents

Advertisement

VIFB11 - 02
4-18
4. Installation

Converting the manual override

The manual override should be converted as
follows:
1. Switch off the compressed air supply and the
operating voltage.
2. Remove the valve from the connection block.
Pilot valve
Base valve
Fig. 4/12: Dismantling the valve
3. Carefully unscrew the two Philips screws on
the cover of the pilot valve, but do not re-
move from the valve. Remove the pilot valve
together with the fastening screws from the
base valve.
Loosen cheese
head screws
9902d

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iifb11-02 series

Table of Contents