Control Outputs; Overview - Siemens RDG100KN Basic Documentation

With knx communications
Hide thumbs Also See for RDG100KN:
Table of Contents

Advertisement

Overview of control
outputs
Control output
Product no.
RDG100KN
RDG16..KN
Control output
Product no.
RDG160KN for 6-port
control ball valve
application P01=5
On/Off control signal
(2-position)
Electric heater control
signal (On/Off)
Caution
Note
3-position
control signal
(RDG100KN only)
68 / 132
Siemens
Building Technologies
3.7

Control outputs

3.7.1

Overview

Different control output signals are available and are defined during commissioning
(see below).
On/Off
Y1, Y2, Y3
(3 x NO)
Q1, Q2,
(2 x NO)
DC 0...10 V
Y10
The valve receives the ON command via control output Y1 (Q1 on RDG16..KN) or
Y3 (Q2 on RDG16..KN) when...
1. the acquired room temperature is below the setpoint (for heating mode) or
above the setpoint (for cooling mode),
2. the control outputs have been inactive for more than the "Minimum output off
time" (factory setting 1 minute, adjustable via P48).
The valve receives the OFF command when...
1. the acquired room temperature is above the setpoint (for heating mode) or
below the setpoint (for cooling mode),
2. the valve has been active for more than the "Minimum output on time" (factory
setting 1 minute, adjustable via P49).
The electric heater receives an ON command via the auxiliary heating control
output (Y..., see Mounting Instructions [3][18]) when...
1. the acquired room temperature is below the "Setpoint for electric heater",
2. the electric heater has been switched off for at least 1 minute.
The OFF command for the electric heater is output when...
1. the acquired room temperature is above the setpoint (electric heater),
2. the electric heater has been switched on for at least 1 minute.
A safety limit thermostat (to prevent overtemperature) must be provided externally.
On RDG16..KN the electric heater can be controlled via the On/Off control output
(Q2) by setting P47 to 1. For adaptive temperature compensation: see 3.6.4.
Heating: Output Y1 provides the OPEN command, and Y2 the CLOSE command to
the 3-position actuator. Cooling: Same with Y3 and Y4.
The factory setting for the actuator's running time is 150 seconds. It can be
RDG100KN, RDG160KN, RDG165KN Basic Documentation
PWM
3-position
Y1, Y3,
Y1/Y2, Y3/Y4
(2 x PWM)
(2 x
/
---
---
DC 2...10 V
DC 10...0 V
Y10
Y10
DC 0...10 V
---
)
Y10, Y20
DC 10...2 V
Y10
CE1P3191en
2018-07-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rdg160knRdg165kn

Table of Contents