Device Disposal - Nice ALTO Instructions And Warnings For Installation And Use

Table of Contents

Advertisement

Available languages

Available languages

generated in the control unit (for example movement inversion in the
Closing manoeuvre).
05. Measure the force as specified in the standard EN 12445. If the motor
force control is used as an auxiliary function for reduction of impact
force, test and identify the setting that obtains the best results.
9.2 - COMMISSIONING
Commissioning can only be performed after positive results of all
test phases. Partial or "makeshift" commissioning is strictly pro-
hibited.
01. Produce the technical documentation of the automation, which must
include at least the following documents: the overall layout drawing
of the system (see example in fig. 4), the electrical wiring diagram
(see example in fig. 26), the analysis of risks present and relative
solutions adopted, and the manufacturer's declaration of conformity
of all devices installed (use appendix 1).
02. Affix a dataplate on the gate, specifying at least the following data:
type of automation, name and address of manufacturer (responsible
for commissioning), serial number, year of construction and CE mark.
03. Permanently attach to the gate the label supplied in the pack, regard-
ing the procedure for manual locking/release of the gearmotor.
04. Compile and provide the automation owner with the declaration of
conformity (use appendix 2).
05. Prepare and provide the automation owner with the User's guide; for
this purpose appendix 3 "User's guide" may be used as an example".
06. Prepare and provide the owner with the form "Maintenance sched-
ule", containing all maintenance instructions for all devices in the
automation.
07. Before commissioning the automation, ensure that the owner is ade-
quately informed of all associated risks and hazards.
––– STEP 10 –––
MAINTENANCE AND DISPOSAL
10.1 - PERIODIC MAINTENANCE
Maintenance must be performed in strict observance of the safety
provisions in this manual and according to current legislation and
standards.
In general, the devices in the "ALTO" system do not require special main-
tenance; however, periodic inspections will enable the user to maintain
system efficiency and ensure correct operation of the safety systems
installed. Therefore we recommend checks every six months, to ensure
perfect efficiency of all devices, performing all tests and checks described
in paragraph 10.1 and paragraph "Maintenance operations admitted for
the user" (appendix 3 - Operation guide).
If other devices are present, follow the instructions in the relative mainte-
nance schedule.
31

10.2 - DEVICE DISPOSAL

This product is an integral part of the automation and therefore
must be disposed together with the latter.
As in installation, also at the end of product lifetime, the disassembly and
scrapping operations must be performed by qualified personnel.
This product is made of various types of material, some of which can be
recycled while others must be scrapped. Seek information on the recy-
cling and disposal systems envisaged by the local regulations in your area
for this product category.
Caution! – some parts of the product may contain pollutant or hazardous
substances which, if disposed of into the environment, may cause serious
damage to the environment or physical health.
As indicated by the symbol alongside, disposal of this prod-
uct in domestic waste is strictly prohibited. Separate the
waste into categories for disposal, according to the meth-
ods envisaged by current legislation in your area, or return
the product to the retailer when purchasing a new version.
Caution! – local legislation may envisage serious fines in the event of
abusive disposal of this product.
English – 22

Advertisement

Table of Contents
loading

Table of Contents