Assa Abloy Sargent FM6100 Series Installation Instructions Manual page 6

Multi-point lock. window shutter applications
Table of Contents

Advertisement

FM6100 Series Multi-Point Lock
Alignment of components in preparation for drilling and pinning continued
4
6
www.sargentlock.com • A8058:A
Before continuing to the next step be certain the top pusher
and bottom bolt are in the correct position.
• Bottom Bolt should be flush to the bottom of
the shutter.
• The lifting platform (item 1) should be moved down the bottom
rod and placed against the shelf of the lifting platform jig.
• Next secure the platforms position by tightening the cone
point set screw (item 2). This will assure the point on the set
screw embeds itself firmly into the bottom rod.

Advertisement

Table of Contents
loading

Table of Contents