FM6100 Series Multi-Point Lock
Alignment of components in preparation for drilling and pinning continued
4
6
www.sargentlock.com • A8058:A
Before continuing to the next step be certain the top pusher
and bottom bolt are in the correct position.
• Bottom Bolt should be flush to the bottom of
the shutter.
• The lifting platform (item 1) should be moved down the bottom
rod and placed against the shelf of the lifting platform jig.
• Next secure the platforms position by tightening the cone
point set screw (item 2). This will assure the point on the set
screw embeds itself firmly into the bottom rod.