Mounting and start-up
5 Mounting and start-up
NOTICE
!
Risk of damage to the device due to incorrect
mounting position.
− Keep rear blow-out opening clear.
− Mount the device in the upright position
only:
5.1 Preparation for installation
Proceed as follows:
Î Flush the pipeline thoroughly before in-
stallation of the Media 7 device.
Î Check the Media 7 device to make sure
that it is clean and not damaged.
Note
The plant operator is responsible for clean-
ing the pipelines in the plant.
32
5.2 Mounting the Media 7 de-
vice
The following options to mount the Media 7
in the plant are available:
− Two M8 tapped holes in the dp cell (see
Fig. 6, 1)
− Two through holes for M8 screws in the
valve block (see Fig. 6, 2)
Î Mounting material for pipe and wall
mounting as accessories (u T 9555)
Î Drill pattern for wall/panel mounting:
see section 3.7.
Additional points that apply concerning in-
stallation:
Î Mount the device to a pipe, wall or
mounting plate free of vibration.
Î Use mounting part with clamp for pipe
mounting to attach it to a vertical or hori-
zontal pipe.
Î Use a mounting part without clamp for
wall mounting.
EB 9510 EN