Measures For Preparation; Unpacking; Transporting And Lifting; Transporting - Samson Media 7 Mounting And Operating Instructions

Differential pressure meter with remote data transmission
Table of Contents

Advertisement

4 Measures for preparation

After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received with the delivery
note.
2. Check the shipment for transportation
damage. Report any transportation dam-
age.

4.1 Unpacking

NOTICE
!
Risk of device damage due to foreign parti-
cles entering it.
Do not remove the packaging and protective
film/protective caps until immediately before
mounting and start-up.
1. Remove the packaging from the device.
2. Dispose of the packaging in accordance
with the valid regulations.

4.2 Transporting and lifting

4.2.1

Transporting

Î Check whether a battery is inserted in
the differential pressure meter and re-
move it before transporting the device.
Î Protect the device against external influ-
ences (e.g. impact).
Î Protect the device against moisture and
dirt.
EB 9510 EN
Measures for preparation
Î Observe the permissible transportation
temperature of –20 to +70 °C.

4.3 Storage

NOTICE
!
Risk of device damage due to improper stor-
age.
− Observe the storage instructions.
− Avoid long storage times.
− Contact SAMSON in case of different stor-
age conditions or long storage periods.
Storage instructions
Î Protect the Media 7 device against exter-
nal influences (e.g. impact).
Î Protect the Media 7 device against mois-
ture and dirt.
Î Make sure that the ambient air is free of
acids or other corrosive media.
Î Observe the permissible storage tem-
perature from –20 to +70 °C.
Î Do not place any objects on the device.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents