Installation; Safety Notes - Pepperl+Fuchs AS-i CC-Link Gateway Manual

Table of Contents

Advertisement

AS-i CC-Link Gateway

Installation

6.
Installation
Read instruction:
Before working with this unit: read these instructions carefully and completely. All notes on safety and
specifications of the device manual and the manual for the configuration software are to be considered!
6.1

Safety notes

Ensure appropiate installation:
Electrical installation is to be performed by trained expert personnel. During installation care must be
taken that supply and signal leads and also the AS-i bus cable are laid separately from power cables. In
the switchgear cabinet it must be ensured that appropriate spark-quenching equipment is used with con-
tactors. Where drive motors and brakes are used, attention must be paid to the installation instructions in
the corresponding operating instructions. Please note that the maximum line length of the AS-i bus cable
is 100 m. Cables above that length require the use of a suitable circuit extension.
HAZARDOUS VOLTAGE:
Before any installation, maintenance or modification work: Disconnect your system from the supply net-
work. Ensure that it cannot be reconnected inadvertently!
You are requested to make sure that the unit will be recycled by the end of its service life.