Leakage Test; Control - Viega Multiplex Trio F Instructions For Use Manual

Drain/overflow functional unit
Hide thumbs Also See for Multiplex Trio F:
Table of Contents

Advertisement

3.2.8

Leakage test

3.3

Control

Multiplex Trio F drain/overflow functional unit
Turn the external ring of the inlet element in such a way that the
screw heads of the screw-in valve is reachable.
Fit Allen screws and tighten only gently by hand.
Screw cover plate onto the drain by hand.
Align and push in overflow rosette.
The leakage test is only carried out as a visual inspection.
Check drain/overflow fitting for visible leaks.
The drain / overflow are controlled via the rotatable rosette on the over-
flow. Proceed as follows to open or close the drain:
Handling
20 from 25

Advertisement

Table of Contents
loading

This manual is also suitable for:

6145.5

Table of Contents