Leakage Test; Control - Viega 6142.33 Instructions For Use Manual

Rotaplex drain/overflow functional unit
Table of Contents

Advertisement

3.2.6

Leakage test

3.3

Control

Rotaplex Drain/Overflow Functional Unit
Place the cover plate onto the valve top and affix.
The holes on the underside of the cover plate must be placed onto
the heads of the screws.
The leakage test is only carried out as a visual inspection.
Check the points marked in the following drawing with particular care:
Check drain fitting for visible leaks.
The drain / overflow are controlled via rotatable rosette on the overflow.
Proceed as follows to open or close the drain:
Turn rotatable rosette to the left.
ð The drain closes itself.
INFO! The valve cone sinks and prevents the water from
draining away. The cover plate does not alter its posi-
tion.
Handling
15 from 16

Advertisement

Table of Contents
loading

Table of Contents