Leakage Test; Maintenance - Viega Profipress S Instructions For Use Manual

Table of Contents

Advertisement

3.4.6

Leakage test

3.5

Maintenance

Profipress S
Open the press jaw and place at a right-angle onto the connector.
Check the insertion depth using the marking.
Ensure that the press jaw is placed centrally on the bead of the
press connector.
Carry out the pressing process.
Open and remove the press jaw.
ð Connection is pressed.
The installer must perform a leakage test before commissioning.
Carry out this test on a system that is finished but not yet covered.
Observe the applicable regulations, see
Leakage test" on page 6.
Document the result.
Observe the applicable regulations for the operation and maintenance
of solar installations, see
on page 7.
Ä „Regulations from section:
Ä „Regulations from section: Maintenance"
Handling
23 from 24

Advertisement

Table of Contents
loading

Table of Contents