JCM GLOBAL RDM-100 Series Integration Manual page 16

Retail deposit module
Table of Contents

Advertisement

4. Attach the Cash Box Transport Path with the four
(4) M4 Screws.
Top Side Mounting
When the top side mounting is preferred, attach
the Cash Box Transport Path by the four (4) M4
Screws (Figure 9
Cash Box ceiling.
Figure 9 Top Side Mounting
Figure 9 Top Side Mounting
Bottom Side Mounting
When the bottom side mounting is preferred,
insert the four (4) M4 Screws M4 Screws (Figure
10
b
to
b
), of the proper length, from the bottom
1
4
side of the Cash Box Ceiling securing the Cash
Box Transport with Nuts (Figure 10
the top side.
Figure 10 Bottom Side Mounting
Figure 10 Bottom Side Mounting
NOTE: The Screw Length is
considered as the Cash Box Ceiling
thickness + approximately 7mm.
P/N 960-000186R_Rev. A {EDP #253995}
RDM-100™ Series Retail Deposit Module
a
to
a
) from the top side of the
1
4
a
2
a
a
1
4
a
3
a
to
a
) to
1
4
a
2
a
a
1
4
a
3
b
b
2
1
b
b
4
3
5. Place the RDM-100 Unit to the home position.
Figure 11 Home Position
Figure 11 Home Position
6. Confirm that the RDM-100 Unit is firmly
installed without backlash.
Figure 12 Latch Plate Positioning
a
Figure 12 Latch Plate Positioning
NOTE: Re-adjust the Latch Plate
position in order to eliminate
movement of the Unit by tightening
two (2) Screws (Figure 12 a)
7. Slide the RDM-100 Unit forward and backward
and confirm the movement is smooth.
Figure 13 Latch Plate Positioning
Figure 13 Latch Plate Positioning
This completes the RDM-100 Unit Installation.
© 2016, JAPAN CASH MACHINE CO., LTD.
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents