Definitions / Glossary - PROLEC PME200 User Manual

Hide thumbs Also See for PME200:
Table of Contents

Advertisement

18 Definitions / Glossary

Definitions of words used to ensure understanding
P/N
Arm
Artic
Attachment
Angle sensor
Boom
Bucket
Blade
CAN cable
Counterweight
Motion Cut
MMI
Pitch
Roll
Power Supply
Pivot pin
Ram
Stabiliser
Slew restriction
Slew limit
SC
Tracked excavator
Track
Turret
Undercarriage
Wheeled excavator
562200-000, Issue 1.2, December 2015
Part Number
Second articulation (stick)
Second articulation of a hydraulically adjustable boom (luffing
boom, knuckle boom, two piece boom)
Tool fixed to the dipper other than a bucket
Sensor detecting current equipment angle
First articulation connected to turret
Digging attachment
Heavy metal plate on the front of the machine, used for stabil
ity and moving material
Cable connecting system components
Weight attached to the rear of an excavator to increase digging
force and lifting capacity
Direct control of component hydraulic service
Man Machine Interface (i.e. Display)
Longitudinal base machine angle (fore / aft)
Lateral base machine angle (side to side)
DC supply voltage
Point at which the articulations rotate about
Hydraulic Cylinder
Hydraulically powered arms that can be lowered and raised to
increase the stability of the machine
Angular slew, virtual wall, multipoint wall
An adjustable angle or virtual wall setting
Safety Controller
An excavator fitted with tracks
Continuous band of treads, metal or rubber covered
Section of machine above the undercarriage
Section which the tracks/wheels attach too
An excavator fitted with wheels
60 of 62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents