Evaluation of the phase voltages is only possible in the case of Y connected input
transformers, otherwise the residual component cannot be detected.
5.14.3

Inputs and outputs

5.14.3.1

CT/VT inputs

Phase voltages
Neutral voltage (optional)
5.14.3.2

Binary inputs

Blocking
5.14.3.3

Binary outputs

Tripping
5.14.3.4

Measurements

Difference between the vector sum of the three phase voltages and the neutral voltage
5.14.4

Function settings

Table 99: Three-phase voltage plausibility function - settings
Text
ParSet 4..1
V-setting
Delay
VT-Compens
VoltageInp
SumInp
BlockInp
Trip
5.14.5

Parameters

Table 100: Three-phase voltage plausibility function - parameters
Signal
ParSet4..1
V-setting
Delay
Table continues on next page
Bay protection functions REB500
Technical manual
Unit
Default
P1 (Select)
U
0.20
N
s
10.00
01.00
CT/VT-Addr
VT U1-U3
CT/VT-Addr
0
BinaryAddr
Always off
Signaladdr
Description
Parameter for determining in which set of parameters a particular function is
active.
Voltage setting for tripping
Time between start signal at the I/P and the tripping signal at the output.
Forbidden setting:= 1 s for voltage settings = 0.2 U
© Copyright 2019 ABB. All rights reserved
Bay protection functions
GUID-38DA99A8-F99F-4607-BD92-17769ADB7CF6 v1
GUID-677C8FDF-21D7-4FAA-8718-EECCD5AA7607 v1
GUID-5D8F8B4C-BA80-4770-AC61-EB924CE8E064 v1
GUID-3AE816A8-2C66-47C3-8D60-5AA8E29686B8 v1
GUID-AA89E181-6F04-489A-97BF-871F7B7B3A36 v1
Min
Max
(Select)
0.05
1.20
0.1
60.0
-2.00
2.00
GUID-978F9F5D-A13B-4F69-BBCB-4D44BAC54CEB v1
N
Section 5
Step
0.05
0.1
0.01
181