3.2.4 Connecting Cables

Context
Figure 3-30 Copper bar position
(1) UPS Output
(4) Battery PE
Procedure
Step 1 Connect the equipotential ground point and the ground bar in the equipment room.
Step 2 Remove the copper bars between the mains input and bypass input. (Perform this step only
when the mains input and bypass input use different power sources.)
Figure 3-31 Removing copper bars
Step 3 Connect input and output busbars and battery cables based on the top copper bar position
diagram.
Step 4 Connect the signal cables between the power units and bypass unit.
Issue 04 (2019-06-25)
(2) Main Input
(5) Equipotential ground point
Copyright © Huawei Technologies Co., Ltd.
3 Installation
(3) Bypass Input
(6) Battery Input