Westerbeke BTDA 15.0 Operator's Manual & Installation Manual page 85

Marine diesel generator set
Table of Contents

Advertisement

Injection Pump Timing
This Information is found in the engine technical manual and should only be performed by a
competent mechanic familiar with Diesel KiKi injection equipment.
Adjustments (Generator)
Once the diesel generator set has been placed in operation, there may be adjustments required
for engine speed (hertz) during the engine's break-in period (first 50 hours) or after this period.
A no-load voltage adjustment may also be required in conjunction with the engine's speed
adjustment. These are not warrantable adjustments as they relate to normal break-in and
maintenance.
!CAUTIONI
Switch
Off
AC Load Before Starting Generator
When starting the generator, all AC loads, especially large motors,
should be
sw~ched
off until the engine has come up to speed and, in
cold climates, starts to warm up. This precaution will prevent damage
caused by unanticipated operation of AC machinery and will prevent a
cold engine from stalling.
Westerbeke Generators
83
15.0KW
BTDA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Btda 12.0

Table of Contents