5 Installation
Fig.19
2
1
Z
1/2 Z
1 Optimum location
2 Possible position
Fig.20
3
2
4
MW-8800N003-6
5.3
Rinsing the system
36
AMC Pro
2
1
H
1/2 H (min. 2,5 m)
5.2.3
1. Choose a recommended location for the outdoor sensor.
2. Put the 2 plugs in place, delivered with the sensor.
3. Secure the sensor using the screws provided (diameter 4 mm).
4. Connect the cable to the outdoor temperature sensor.
Installation must be carried out in accordance with the prevailing
regulations, codes of practice and the recommendations in this manual.
Before a new boiler can be connected to an existing or new system, the
entire system must be thoroughly cleaned and flushed. This step is
absolutely crucial. The flushing helps to remove residue from the
installation process (weld slag, fixing products etc.) and accumulations of
dirt (silt, mud etc.)
1/2 H (min. 2,5 m)
H
H Inhabited height controlled by the sensor
Z Inhabited area controlled by the sensor
Fitting the outdoor sensor
Plugs diameter 4 mm/drill diameter 6 mm
Important
Flush the system with a volume of water equivalent to at least
three times the volume of the system.
Flush the DHW pipes with at least 20 times the volume of the
pipes.
1
2
MW-8800N001-3
7725131 - v.01 - 06062019