Changing Boiler Parameters When Scb-10 Is Fitted - DeDietrich EVODENS PRO Series Installation And User Manual

High-efficiency wall-hung gas boiler
Table of Contents

Advertisement

8 Settings
Fig.68
Installer level
........ .......
........ ......... ...
00:12
..... ... ....... .... .. ..... ....... .... ..... .......
i
........ .......
0
0
0
1
1
1
2
2
2
3
3
3
4
4
4
5
Tab.50
CU-GH08
Icon
Zone or function
CIRCA / CH
Gas fired appliance
Tab.51
SCB-10
Icon
Zone or function
CIRCA
CIRCB
DHW
CIRCC
0-10 volt input
Digital Input
Analogue input
Cascade management B
Buffer Tank Schedule
Outdoor temperature
Status information
Tab.52
Configuring a zone or function of CU-GH08 or SCB-10
Parameters, counters, signals
Parameters
Counters
Signals
Adv. Parameters
Adv. Counters
Adv. Signals
58
AMC Pro
0
1
2
3
4
5
6
AD-3001378-02
Description
Central heating circuit
Gas boiler
Description
Central heating circuit A
Central heating circuit B
Domestic hot water external circuit
Central heating circuit C
0–10 volt input signal
Digital input signal
Analogue input signal
Management of a cascade of multiple boilers
Enable a buffer tank with one or two sensors
Outdoor sensor
PCB SCB-10 status information
Description
Set the parameters at installer level
Read the counters at installer level
Read the signals at installer level
Set the parameters at advanced installer level
Read the counters at advanced installer level
Read the signals at advanced installer level
3. Use the rotary knob to select code: 0012.
4. Press the
button to confirm the selection.
When the installer level is enabled, the status of the tile [
changes from Off into On.
5. To leave the installer level, select the tile [
6. Use the rotary knob to select Confirm or Cancel.
7. Press the
button to confirm the selection.
When the installer level is disabled, the status of the tile [
changes from On into Off.
When the control panel is not used for 30 minutes, the installer level is left
automatically.
Configuring the installation at installer level
Configure the installation by pressing the
Installation Setup
. Select the control unit or circuit board you want to
configure:
8.2.2

Changing boiler parameters when SCB-10 is fitted

When the boiler is fitted with the SCB-10 the following boiler CU-GH08
parameter(s) at installer level must be checked and adjusted, if necessary:
]
] .
]
button and selecting
7725131 - v.01 - 06062019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents