Emerson Daniel 3410 Series Retrofit Instructions page 30

Gas ultrasonic electronics
Hide thumbs Also See for Daniel 3410 Series:
Table of Contents

Advertisement

Installing the 3410 Series Electronics
3.
4.
5.
6.
20
Figure 5-2:
Remove acquisition cable and module
Unscrew the remaining two mounting screws from the acquisition module in the
base enclosure and remove the acquisition board.
Place an insulating gasket on the meter body where the electronics will be mounted
(see gasket in Figure 3-4).
Place the base enclosure on top of the meter body on top of the insulating gasket.
Note that the transducer port openings on the base enclosure are labeled with
transducer locations (i.e., A1, A2, B1, B2, C1, C2, D1, D2).
a. Orient the base so that the A1 transducer port is closest to the A1 transducer
location on the meter body. The meter body has the transducer location labels
embossed in the body next to each transducer boss. The ports on the base
enclosure must be oriented outward (towards the sides of the meter body,
perpendicular to meter axis).
Figure 5-3:
Base enclosure orientation
Use the four ¼" bolts with stainless steel washers and nylon shoulder washers to
secure the base enclosure to the meter body.
a. Use a nut driver to tighten the bolts to a torque of 55 to 65 inch-lbs.
Retrofit Instructions

Advertisement

Table of Contents
loading

Table of Contents