6.1 Preparations for Site Maintenance

Before maintaining an EG860, familiarize yourself with the site information, choose a
maintenance task, and arrange tools and spare parts.
Learning Site Information
Learn the following information about the site before going onsite:
l
l
l
l
Choosing a Maintenance Task
Choose a proper maintenance task from the following items:
l
l
l
Arranging Tools and Spare Parts
Arrange necessary tools and spare parts for maintaining an EG860.
The following lists commonly used maintenance tools.
l
l
l
l

6.2 Powering on/off an EG860

Perform the following operations to power on or power off an EG860.
Procedure
l
Issue 02 (2015-04-10)
Uncleared faults and alarms of the site
Hardware configurations on the site
Natural environment
Spare parts
Maintain the EG860 equipment room.
Maintain power supply and grounding systems of an EG860.
Maintain an EG860.
Devices for frequency tests: include a frequency meter, a spectrum analyzer, connectors
and cables.
Power meter: is frequently used to measure and analyze the output power of an EG860.
SiteMaster: is frequently used for antenna and feeder tests in terms of standing wave ratio,
return loss, cable insertion loss, and fault location.
Other devices:
– Multimeter
– Web
NMS
– Spare parts
Power on an EG860.
1.
Switch on the power supply connected to the EG860.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Maintenance
77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eg860-d61Eg860-c71

Table of Contents