Table 4-2 Checklist for hardware installation
No.
1
2
3
4
5
Complete the items for cable installation listed in
Table 4-3 Checklist for cable installation
No.
1
2
3
4
5
6
7
Issue 02 (2015-04-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Check Item
The equipment position conforms to the
engineering drawing and meets the space
requirement. Sufficient space is reserved for
equipment maintenance.
A
SIM
card is properly inserted.
The EG860 is properly mounted on a mental
pole. The bracket is secure.
The EG860 is fixedly mounted on a wall. The
holes in the bracket are aligned with those for
expansion bolts and the bracket is placed
against the wall securely and evenly.
Labels are correct, neat, and complete.
Table
4-3.
Check Item
The
PGND
cable is green and yellow. The
NEG (-) cable is blue and the RTN (+) cable
is black.
None of power cables or
short-circuited or reversely connected.
The bare wires and lug handles at the wiring
terminals are tightly wrapped up with
insulation tape.
The protection grounding of the EG860 and
the surge protection grounding of the building
share one group of ground conductors.
There are no connectors or joints on each
power cable or
PGND
The connectors of the
POE
connected.
The shield layer of the power cable is intact
and the power cable is properly grounded.
4 Installation
PGND
cables is
PVC
cable.
cable are securely
62