N O T E !
• The diaphragm of the sample gas pump N3/5/9 KPE should be checked every six months and, if
necessary, replaced (see chapter 15.2).
• The hose of the condensate pump SR25.2 should be checked every six months and, if necessary,
replaced (see chapter 15.3.1);
• Remove dust periodical from the cooling fins with pressure air (see chapter 15.4)
15.1 REPLACEMENT OF THE FILTER ELEMENT AND THE O-RING
N O T E !
For changing the filter element and the O-ring:
•
Disconnect the mains voltage
•
Unscrew the filter housing cover
•
Exchange the filter element and/or O-ring. Pay attention to the correct insertion of the filter
element and the O-ring (the textured surface of the filter element points to the front)!
•
Screw on the filter housing cover again.
Figure 7
Replacing the filter element and the O-ring
www.mc-techgroup.com
In order to protect downstream analyzers, the wet filter element must
always be replaced in the event of a condensate ingress.
In any case you open the filter, the filter element has to be changed.
CSS-V | 1.01.02
23