Relocate The Connections To The Back Of The Housing - M&C CSS Series Instruction Manual

19“ housing or wall mounting gas conditioning unit
Hide thumbs Also See for CSS Series:
Table of Contents

Advertisement

Follow these steps to mount the sample gas and condensate tubes:
• Remove the union nut from the sealing ring couplings by turning it anti-clockwise. Be sure to remove
the union nut carefully from the fitting. There is a loose clamp ring inside the union nut.
• Place the union nut over the connecting tube.
• Push the sealing ring over the connecting tube with the thicker bulge facing the nut.
• Place the tube over the nipple on the thread.
The tightness of the connections can only be guaranteed if the connecting
tube has a straight edge (use a hose cutter).
N O T E !
• Hand-tighten the nut.
The tube is now slip-proof and pressure-tight mounted to the hose connection fitting.
The tubes are to be removed in the reverse order.
W A R N I N G !

12.2 RELOCATE THE CONNECTIONS TO THE BACK OF THE HOUSING

If the installation conditions require to relocate the connections to the back of the housing, follow these
steps:
Remove connection sheet fixing screws (see Figure 5)
Remove cover angle fixing srews at the back of the unit
Attach connection sheet with 2 fixing screws at the back of the unit
Attach cover angle with 2 fixing screws at the top of the housing
18
Aggressive condensate is possible.
Chemical burns caused by aggressive media possible!
Wear protective gloves and protective glasses!
Wear proper protective clothing!
CSS-V | 1.01.02
www.mc-techgroup.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Css-v1Css-v2

Table of Contents