Receiving And Storing; Installation Instructions - M&C CSS Series Instruction Manual

19“ housing or wall mounting gas conditioning unit
Hide thumbs Also See for CSS Series:
Table of Contents

Advertisement

10 RECEIVING AND STORING

The gas sampling systems CSS-V1 and CSS-V2 are completely pre-installed unit. The scope of delivery
includes furthermore:
25 x Filter elements (1 package)
1 x Connection cable
1 x 6-pole connection box
1 x Instruction Manual
Please remove the CSS-V1 or CSS-V2 carefully from the packaging. Check the scope of the delivery
specified on the delivery note. Please make sure that you have received all items stated on the delivery
note.
Please check the unit for any transport damages after receipt and report any complaints to the transport
company immediately.
The gas conditioning system should be stored in a protected frost-free area
N O T E !

11 INSTALLATION INSTRUCTIONS

In order to ensure that the case is safe and stable when being used, it should
be placed on a horizontal surface free from vibrations. Only then, the perfect
functioning of the separation and drainage procedures of the condensate
N O T E !
inside the heat exchanger of the cooler will only be guaranteed.
The gas conditioning system should be kept away from heat sources and be
freely ventilated in order to prevent an accumulation of heat.
When the equipment is being used outside, ample protection against the
effects of direct sunlight and dampness must be provided. In winter, the
equipment must only be used in frost-free areas; pay attention to the type of
the equipment protection.
Please avoid temperature variations, strong airflow as well as aggressive
atmospheres at the place of installation.
In order to guarantee the operational safety of the gas conditioning system
and the downstream analysers, and to avoid false alarms, the gas conditioning
unit should not be used at temperatures other than those specified.
Furthermore, it must be protected against dust deposits and penetrating dust.
It is of great importance that the analysers connected downstream are used at
temperatures well above the specified gas outlet dew point of +5 °C [41 °F].
This prevents the gas in the connector lines to the analysers from subsequent
condensing.
Unheated gas sample lines must be installed with slope up to the cooler.
16
CSS-V | 1.01.02
www.mc-techgroup.com
!

Advertisement

Table of Contents
loading

This manual is also suitable for:

Css-v1Css-v2

Table of Contents