11.1 RETROFITTING OF THE WALL MOUNT HOUSING TO A 19"-HOUSING
The gas conditioning units CSS-V1 and CSS-V2 are delivered with a wall mounting housing.
If a 19"-housing is needed, the gas conditioning unit can be retrofitted very easy by installing the
mounting brackets from the back to the front:
•
Remove two fixing screws per bracket,
•
Align the angle with the 19" mounting holes facing the front,
•
Fix the mounting bracket flush with the front panel at the housing by using the two fixing screws.
12 SUPPLY CONNECTIONS
12.1 HOSE CONNECTIONS
Figure 5
Hose connections CSS-V1
Do not mix up the hose connections.
Check the seals after connecting all lines.
N O T E !
Contrary to Figure 5, version CSS-V2 has two sample gas outlets.
The condensate connections are carried out directly at the peristaltic pump.
All tube connections are DN 4/6 mm sealing ring threaded hose couplings out of PVDF/PPH as standard.
They are suitable for gas inlet temperatures of maximum 80 °C [176 °F] (see chapter 8).
www.mc-techgroup.com
CSS-V | 1.01.02
17