Wait at least three minutes after downloading the change to the device before carrying out the
first insulation test. Further details are available in section "Insulation test" in chapter "Built-in
functions" (Page 87).
B.3
Uploading the device data to the pc
Select "Device" → "Upload to PC/PG" to load all device parameters from the device to the pc.
SITRANS MAG 8000
Operating Instructions, 11/2018, A5E03071515-AE
Qualification certificate
B.3 Uploading the device data to the pc
131