Indoor Unit Verification; Verifying Data Connectivity; Table 3-7: Ps1073 Idu Leds - Alvarion BreezeNET B System Manual

Hide thumbs Also See for BreezeNET B:
Table of Contents

Advertisement

Chapter 3 - Commissioning
3.5.2

Indoor Unit Verification

To verify the correct operation of the indoor equipment, examine the LED
indicators located on the top panel of the IDU units.
The following table lists the LEDs of the PS1073 IDUs and their associated
indications.
Name
Description
POWER
Power Indication
ETH
Self test and end-to-end
Ethernet connectivity
3.5.3

Verifying Data Connectivity

To verify data connectivity, from the end-user's PC or from a portable PC
connected to the unit, ping the other unit or a station behind it.
BreezeNET B

Table 3-7: PS1073 IDU LEDs

Functionality
Green - IDU power is OK
Off - No power or power failure
Off - No Ethernet connectivity has been detected between the
outdoor unit and the device connected to the indoor unit.
Green- Self-test passed and Ethernet connection confirmed
by the outdoor unit (Ethernet integrity check passed).
48
Operation Verification
System Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents