Chapter 3 - Commissioning
3.5
Operation Verification
The following sections describe how to verify the correct functioning of the
Outdoor Unit, Indoor Unit, Ethernet connection and data connectivity.
3.5.1
Outdoor Unit Verification
To verify the correct operation of the Outdoor Unit, examine the LED indicators
located on the bottom panel of the outdoor unit.
The following tables list the provided LEDs and their associated indications.
NOTE
Verifying the correct operation of the Outdoor Unit using the LEDs, as described below, is only
possible after the configuration and alignment processes are completed.
Name
W-LINK
Status
ETH
SNR BAR
BreezeNET B
Table 3-4: BU-ODU LEDs
Description
Wireless Link Indicator
Self-test and power indicator
Ethernet activity/connectivity
indicator
Received signal strength
Indicator (In Normal Mode)
Functionality
Green - Unit is associated with an RB
Blinking red - Unit is not associated
Off - Wireless link is disabled
Green - Power is available and self-test passed.
Blinking Amber - Testing (not ready for operation)
Red - Self-test failed - fatal error
Green -Ethernet link detected.
Amber - No Ethernet connectivity between the
indoor and outdoor units.
Table 3-6
See
for details.
The SNR bar LEDs turn green only after receiving
traffic from the RB side (SNR is updated based on
uplink data or management frames)
46
Operation Verification
System Manual