Chapter 3 - Commissioning
3.4

Operation Verification

The following sections describe how to verify the correct functioning of the
Outdoor Unit, Indoor Unit, Ethernet connection and data connectivity.
3.4.1

Outdoor Unit Verification

To verify the correct operation of the Outdoor Unit, examine the LED indicators
located on the bottom panel of the outdoor unit.
The following tables list the provided LEDs and their associated indications.
NOTE
Verifying the correct operation of the Outdoor Unit using the LEDs, as described below, is only
possible after the configuration and alignment processes are completed.
Name
W-LINK
Status
ETH
32

Table 3-3: BU-ODU LEDs

Description
Functionality
Wireless Link
Indictor
Self-test and power
indication
Ethernet activity/
connectivity
indication
Green – Unit is associated with an RB
Blinking red – Unit is not associated
Off – Wireless link disabled
Green – Power is available and
self-test passed.
Blinking Amber – Testing (not ready for
operation)
Red – Self-test failed – fatal error
Green –Ethernet link detected.
Amber – No Ethernet connectivity between
the indoor and outdoor units.