Smart Energy Management Status

 
PROT: The protocol type to which the port is set:
l
 
For a SolarEdge device:
o
RS485 protocol
 
 
For electricity meters,   r efer to the application note - Connecting an Electricity Meter 
o
to SolarEdge Devices at http://www.solaredge.com/files/pdfs/solaredge-meter-
installation-guide-na.pdf.
 
SS: SunSpec - for a non-SolarEdge logger (monitoring and control)
o
Smart Energy Management Status
This screen is displayed only when Smart Energy Management is enabled. The screen shows energy details 
of the site:
S i t e
L i m i t :
S i t e
P r o d :
S i t e
E x p o r t :
S e l f - c o n s u m e :
 
Site Limit: The limit that was defined for the site
l
 
Site Prod: The power produced by the site
l
 
Site Export: The power that is fed into the grid
l
Self-consume: The PV power consumed by the site
 
l
For more information, refer to the Export Limitation Application Note, available on the 
SolarEdge website at https://www.solaredge.com/sites/default/files/export_limitation_
application_note_NA.pdf.

Power Control Status

This screen is displayed only when Power Control is enabled (available from 
communication board (CPU) firmware version 2.7xx/3.7xx and later).
P W R
C T R L :
P W R
L i m i t :
C o s P h i :
P o w e r
P r o d :
 
 
PWR CTRL: The power control status: 
l
 
REMOTE - Communication with the RRCR or smart energy manager is confirmed/validated. 
o
LOCAL - The power is controlled locally (e.g. by a fixed limit), or this inverter limits the PV power 
 
o
production to its relative portion of the feed-in power limit, as a result of disconnected 
communication with the smart energy manager. If this status appears, check the communication 
to the smart energy manager or the communication to the meter. 
50
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
S: SolarEdge slave
M: SolarEdge master
P2P: ZigBee point-to-point
MPM: ZigBee multipoint master (for the   Z igBee gateway or 
for load management by the inverter)
MPS: ZigBee multipoint slave (for a ZigBee router card)
7 . 0 k W
1 0 . 0 k W
4 . 0 k W
6 . 0 k W
R E M O T E
1 0 . 0 4
k W
0 . 9
7 0 0 0 W
ZigBee protocol

Hide quick links: