Step 3: Verifying Proper Activation; Reporting And Monitoring Installation Data; The Monitoring System - SolarEdge SE3000H-US Installation Manual

Single phase inverter with hd-wave technology
Hide thumbs Also See for SE3000H-US:
Table of Contents

Advertisement

While the inverter is in Wakeup mode, it monitors the grid and verifies correct grid voltage and frequency. 
The following message is displayed:
W a k i n g
R e m a i n i n g :
The countdown indicates the seconds remaining until entering the Production mode. This time is in 
accordance with local regulations and is typically between three to five minutes. 
When countdown is complete, the inverter enters Production mode and produces power. The steadily 
lit green inverter LED indicates this mode.

Step 3: Verifying Proper Activation

After the wake-up time is over, a status screen similar to the following appears on the inverter LCD panel:
V a c [ V ]
2 4 0 . 7
3 7 1 . 9
P _ O K :
X X X / Y Y Y
. . . . . . . . . . . . . . . . .
 1.  Verify the following: 
 
The green inverter LED is steadily lit.
l
 
The ON/OFF indicator on the LCD panel reads ON.
l
 
P_OK: XXX/YYY:   T here is a connection to the power optimizers and at least one power optimizer is 
l
sending monitoring data. Optimizers send telemetries in a frequency of up to 10 minutes.
 
S_OK appears, if the inverter is connected to the SolarEdge monitoring platform. 
l
 
Vac [V] specifies the measured grid AC output voltage. 
l
 
Vdc [v] specifies the DC input voltage, which should be approximately the inverter DC voltage (model 
l
dependent; refer to the inverter datasheet)
 
Pac [W] specifies the AC output power produced.
l
 2.  Take note of the serial number on the inverter label using the detachable 2D barcode sticker on each 
device. This information is used in the SolarEdge monitoring platform to identify this inverter.
Your SolarEdge power harvesting system is now operational.

Reporting and Monitoring Installation Data

NOTE
This step requires connecting one of the communication options. Refer to Setting Up
Communication  on page 52.

The Monitoring System

The monitoring platform   e nables accessing   s ite information, including up-to-date 
information viewed in a physical or logical view. The monitoring platform is described in 
detail in the   M onitoring Platform User Guide, available on the SolarEdge website at 
http://www.solaredge.us/files/pdfs/solaredge-monitoring-platform-user-guide.pdf. 
The   m onitoring platform can display logical and physical layouts of the installed system, 
as follows:
 
Logical Layout: Shows a schematic logical layout of the components in the system, such as: inverters, 
l
strings and modules, as well as their electrical connectivity. This view enables you to see which 
modules are connected in each string, which strings are connected to each inverter, and so on.
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
U p . . .
0 5 1
S e c
V d c [ V ]
P a c [ W ]
2 3 4 9 . 3
< S _ O K >
O N
Chapter 5: Commissioning the Installation
35