3. Check that the altitude of the actual usage site is below 3281ft (1000m). If exceeds,
derate1% for every additional 328ft (100m).
4. Check that the humidity of the actual usage site is below 90% and condensation is
not allowed. If no, add additional protection inverters.
5. Check that the actual usage site is away from direct sunlight and foreign objects
can not enter the inverter. If no, add additional protective measures.
6. Check that there is no conductive dust or flammable gas in the actual usage site. If
no, add additional protection to inverters.
2.1.4 Installation confirmation
Check as follows after the installation:
1. Check that the load range of the input and output cables meet the need of actual
load.
2. Check that the accessories of the inverter are correctly and properly installed. The
installation cables should meet the needs of every component (including reactors,
input filters, output reactors, output filters, DC reactors, braking units and braking
resistors).
3. Check that the inverter is installed on non-flammable materials and the calorific
accessories (reactors and brake resistors) are away from flammable materials.
4. Check that all control cables and power cables are run separately and the routation
complies with EMC requirement.
5. Check that all grounding systems are properly grounded according to the
requirements of the inverter.
6. Check that the free space during installation is sufficient according to the
instructions in user's manual.
7. Check that the installation conforms to the instructions in user's manual. The
inverter must be installed in an upright position.
8. Check that the external connection terminals are tightly fastened and the torque is
appropriate.
9. Check that there are no screws, cables and other conductive items left in the
inverter. If no, get them out.
2.1.5 Basic commissioning
Complete the basic commissioning as follows before actual utilization:
1. Autotune. If possible, de-coupled from the motor load to start dynamic autotune. Or
if no, static autotune is available.
2. Adjust the ACC/DEC time according to the actual running of the load.
3. Commission the device via jogging and check that the rotation direction is as
required. If no, change the rotation direction by changing the wiring of motor.
4. Set all control parameters and then operate.