Before You Begin The Installation - Avaya G250 Installing And Upgrading

Hide thumbs Also See for G250:
Table of Contents

Advertisement

Before you install
- Nine 5/16" flat-head screws.
- Four rubber feet.
- One bridge for NVRAM init.
Media modules for connecting voice and data devices and outside lines are packaged and
shipped in separate boxes. The Avaya Partner Contact Closure adjunct box, if ordered, is also
packaged separately.

Before you begin the installation

1. Unpack the G250 and accessories.
2. Unpack each media module.
ELECTROSTATIC ALERT:
Wear an anti-static wrist ground strap whenever handling components of an
ELECTROSTATIC ALERT:
Avaya G250 Media Gateway. Connect the strap to an approved ground, such as
an unpainted metal surface.
3. Check the contents of the packaging against the customer order.
4. Cross-check the customer order with the planning documentation you have been given.
Media modules, telephones and other equipment are listed on your planning and shipping
documentation. Placement for the media modules and other equipment are also indicated.
5. Verify that all necessary elements have been received and are in good condition. If there
are missing or damaged elements, contact your project manager. The planning
documentation will list contact information for key personnel.
If you have any questions about the equipment order, or if the equipment has been damaged,
contact your project manager.
24 Installing and Upgrading the Avaya G250 Media Gateway

Advertisement

Table of Contents
loading

Table of Contents