Body Frame; Diagnostic Information And Procedures; Alignment Checking; Repair Instructions - Suzuki XL7 2007 Service Manual

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

11A-1 Body Frame:

Body Frame

Alignment Checking

Use a measuring tram gage as an accurate method of determining the alignment of the underbody. The tram gage set
required to perform the recommended measuring checks must include a vertical pointer capable of reaching 457 mm
(18 in).
The following 2 types of measurement may be made using a tram gage:
• Direct point to point measurements
• Measurements calculated on a horizontal plane (datum line) parallel to the underbody
Dimensions that are measured to gage holes are measured to the center of the holes and flush to the adjacent metal
surface unless otherwise specified. It is recommended that the diagonal dimensions be cross body checked on both
sides in order to verify the dimensional accuracy of the vehicle underbody. Set vertical pointers equally as needed per
your application.

Drivetrain and Front Suspension Frame

Reinforcement Replacement

Removal Procedure
1. Raise and support the vehicle. Refer to "Lifting and
Jacking the Vehicle: ".
2. Use the utility stand at the rear cross member of the
frame to support the frame.
3. Remove the reinforcement bolts (3).
4. Remove the rear frame to body bolts (2). DISCARD
the bolts.
5. Remove the reinforcement (1) from the vehicle.

Diagnostic Information and Procedures

Repair Instructions

Installation Procedure
1. Position the reinforcement (1) to the vehicle.
2. Loosely install NEW rear frame to body bolts (2).
3. Loosely install the reinforcement bolts (3).
CAUTION
!
Refer to "Fastener Notice: ".
4. Tighten the reinforcement bolts (3).
Tightening torque
Tighten the bolts to 50 N⋅m (37 lb ft).
5. Tighten the frame to body bolts (2).
Tightening torque
Tighten the bolts to 155 N⋅m (114 lb ft).
6. Remove the utility stand from the frame.
7. Lower the vehicle.

Advertisement

Table of Contents
loading

Table of Contents