Installing And Routing Network Management Cables - Huawei OptiX OSN 3500 Quick Installation Manual

Hide thumbs Also See for OptiX OSN 3500:
Table of Contents

Advertisement

c
Underfloor Cabling
1
Route the clock cables into the cabinet through the
cable holes at the bottom of the cabinet.
Route the clock cables through the cable distribution
plate and connect them to the clock ports on the AUX
board.
10

Installing and Routing Network Management Cables

A
2
3
4
Network management computer
A
ETH port
DCN
Network
management
cable
Route the clock cables upwards along the side panel
of the cabinet to the cable distribution plate.
Trim the clock cables and bind them onto the binding
plate.
CAUTION
Connect network management
cables only to the gateway NE.
NOTE
When routing network management
cables, use the method similar to
that for routing E1 cables.
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents