10
Installing the UPM Power System
NOTE
For the method of installing the ETP4890 UPM Power System, see the ETP4890 User Manual.
a
Installation Position
b
Installing Batteries
To BAT-
Upper-
layer tray
Lower-
layer tray
Connect four batteries in series and fix them on the lower-layer tray.
Connect four batteries in series and fix them on the upper-layer tray.
Connect the battery series in parallel.
Subrack
Power system (EPS75-4815AF)
23
≥50 mm
To BAT+