Installing and Routing E3/T3/E4/STM-1 Cables

a
Overhead Cabling
• Routing E3/T3/E4/STM-1 cables for the upper subrack
1
1
Route the cables into the cabinet through the cable
holes on the top of the cabinet. Then, route the
cables downwards along the rear panel of the
cabinet to the cable distribution plate above the
upper subrack.
4
3
Connect the E1 cables to the ports on the interface
board, and then fasten the captive screws of each
DB44 connector.
NOTE
When the 16-wire E1 cables are used, bind the
cables for three layers on the side panel of the
cabinet.
2
2
Route the cables through the cable distribution plate,
and then connect them to the SMB ports on the
interface board from the upper part to the lower part.
50