Installation Method; Install Mounting Ears On The Fiber Management Tray; Spooling Fibers In The Fiber Management Tray - Huawei OptiX OSN 3500 Quick Installation Manual

Hide thumbs Also See for OptiX OSN 3500:
Table of Contents

Advertisement

c

Installation Method

1
M4
12±1.2 Kgf.cm
1

Install mounting ears on the fiber management tray.

NOTE
By default, the fiber management tray is installed in the lower part of the cabinet and is more than 50 mm
away from the subrack. The fiber management tray must also be more than 50 mm away from the air inlet
and outlet of the subrack. The fiber management tray can be installed in a cabinet that is not fully configured
with subracks, but future expansion will be affected due to reduced installation space in the cabinet.
d

Spooling Fibers in the Fiber Management Tray

With no attenuator used (the optical fibers connected to
the optical interface board are on the same side of the
cross-connect and timing board)
Variable optical attenuator
With the attenuator used (the optical fibers connected to
the optical interface board are on the same side of the
cross-connect and timing board)
2
Phillips screwdriver
2
14
M6
30±3 Kgf.cm
Secure the fiber management tray in the cabinet.
With no attenuator used (the optical fibers connected to
the optical interface board are on different sides of the
cross-connect and timing board)
Variable optical attenuator
With the attenuator used (the optical fibers connected to
the optical interface board are on different sides of the
cross-connect and timing board)
>50 mm