Examine the UPS for any sign of damage and ensure that the received UPS corresponds to the material
indicated in the delivery note. Notify your carrier or supplier immediately if damage is apparent. The
content of the package is:
- 1 x PowerValue 31/11 T UPS
- 1 x User manual
- 1 x parallel cable
- 1 x parallel port cover plate
- 1 x Metal fork (1 pole)
- 1 x Metal fork (3 poles)
- 1 x Cable for connections from M2 to metal fork
- 2 x M5x12 HEX screw
- 4 x cable glands
- 1 x Monitoring Software CD
4.1.3

UPS storage

If you plan to store the UPS prior to use, keep the UPS in a dry, clean and cool storage room with an
ambient temperature between -15 °C and +60°C and humidity of less than 95% non-condensing. If the
packing container has been removed, protect the UPS from dust. Keep the UPS always in upright
position and do not drop the equipment.
4.1.4

Planning before the installation

The appropriate place of installation for the unit is to be selected in such a way that the danger of
damage to the UPS is minimized and a long service life of the device is thus ensured. Please observe
the following instructions:
- Install the UPS in an indoor area.
- Leave 50 cm of space on each side of the cabinet to enable cooling airflow and ensure that the
circulation of air to the ventilation slits is not obstructed.
- Avoid excessively high temperature and excessive moisture.
- Make sure that the surface is solid and flat.
- Note that water condensing may occur if the UPS is unpacked in a very low temperature environment.
In this case, it is necessary to wait until the UPS is fully dried inside out before proceeding with the
installation to avoid hazards and electric shock.
4.2

Electrical Installation

4.2.1

Commissioning

The UPS must be commissioned by a fully trained and authorized field service engineer before being put
into use. The commissioning of the UPS involves the connection of the UPS and batteries, the
verification of the electrical installation and operating environment of the UPS, the controlled start-up and
testing of the UPS and customer training.
WARNING!
To ensure correct operation of the UPS and batteries, it is necessary to provide the mains cables with
appropriate fuse protection.
OPERATIONS INSIDE THE UPS MUST BE PERFORMED BY A SERVICE
ENGINEER FROM THE SUPPLIER OR FROM AN AGENT AUTHORIZED
BY THE SUPPLIER.
DO NOT OPERATE IN CASE OF PRESENCE OF WATER OR MOISTURE.
WHEN OPENING OR REMOVING THE UPS-COVERS YOU ARE EXPOSED
TO DANGEROUS VOLTAGES.
PHYSICAL INJURY OR DEATH MAY HAPPEN, DAMAGE TO THE UPS OR
TO THE LOAD EQUIPMENT MAY OCCUR IF THESE INSTRUCTIONS ARE
IGNORED
4NWP100559R0001_OPM_ABB_PVA31-11-T_10-20kVA_EN_140626
Modifications reserved
Page 12/37 ABB