4.2.2.3 Parallel system cabling
1. Prepare the input and output wires, the output breaker, and the parallel cable according to section
4.2.2.1.
2. Use the standard 25-pin communication cable provided with the UPS. (The length of the parallel
cable should be lower than 3 meters.
3. Remove the cover plate of the parallel port of the UPS (refer to Figure 3 and Figure 5), connect each
UPS one by one with the parallel cable, and re-screw the parallel port cover supplied in the
accessories.
4. Disconnect the jumpers JP1 and JP2 on the terminal block, and connect each output breaker to a
main output breaker and then to the loads.
5. Strictly follow the wiring requirement of single UPS to perform the wiring of each UPS. Note that each
UPS needs an independent battery pack. (Refer to section 4.2.2.1 and Figure 15 and Figure 15)
6. Connect the output wires of each UPS to an output breaker panel.
7. It is recommended that the distance between the UPSs in parallel and the breaker panel is lower than 20
meters. The difference in length between the wires of the input and output of the UPSs is required to be
less than 20%.
Figure 14: Terminal block wiring diagram in parallel configuration
DO NOT CONNECT EQUIPMENT THAT COULD OVERLOAD THE UPS
SYSTEM (E.G. LASER PRINTERS)
4NWP100559R0001_OPM_ABB_PVA31-11-T_10-20kVA_EN_140626
Modifications reserved
Page 18/37 ABB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents