Siemens SIMATIC IPC477E PRO Operating Instructions Manual page 54

Hide thumbs Also See for SIMATIC IPC477E PRO:
Table of Contents

Advertisement

Commissioning the device
5.1 Notes on commissioning and operation
Notes on operation
Note
During the boot process...
• Make sure that there are no conductive liquids on the touch screen during startup.
• Do not touch the touch screen during startup.
The device automatically calibrates the touch screen during startup.
Requirement
● The terminal compartment cover of the PRO device is open.
● The device is connected to the power supply.
● The protective conductor is connected.
● The connection cables are plugged in correctly.
● The following hardware is available for initial commissioning:
– One USB keyboard
– One USB mouse
Note
Switching on the PRO device
An external on/off switch is recommended to avoid having to continually open the terminal
compartment cover.
54
SIMATIC IPC477E PRO
Operating Instructions, 08/2017, A5E39912462-AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents